5 Defries Street

CATEGORY: Slope Remediation, and Engineered Earth Fill Slope

OBJECTIVE: Remove and replace the existing slope to meet development requirements. The engineered slope will achieve a minimum factor of safety of 1.5.

SLOPE HEIGHT: 4 to 5 metres

CLIENT: Defries Development Limited

PROJECT HIGHLIGHTS: Design Drawings for Slope Restoration, Global Stability Analysis for Proposed Slopes and Associated Structures Construction Recommendations